Test Closure Report

Table of Contents

  • Document information

  • Project overview

  • Tests executed

  • Test completion matrix

  • Defect metrics

  • Exit criteria status

  • Approvals

Document information

  • Project start date: July 2022

  • Project end date: March 2023

Project Overview

Project typeTesting

Project duration

July 2022 to March 2023

Operating system

Windows

Browsers tested

Chrome, IE, Mozilla, Safari

Testing performed

Desktop

Mode of testing

Manual

All reported issues have been solved

Yes

All defects logged

Yes

Critical issues

No

Test closure activities completed and signed off

Yes

Tests Executed

This refers to the execution of test cases to ensure they meet the pre-defined requirements and specifications. It is the execution of tests by running the system under test cases, and obtaining the actual results that can be compared with the expected results to determine whether the tests have passed or failed. This is the first cycle of test execution for MVP, which is performed manually. This test execution does not include automation testing.

Test cycle numberPlanned number of tests per cycleTotal number of tests executedTotal number of passed test casesPassed percentageNumber of failed test casesFailure percentage

10

10

118

118

100

0

0

Test Completion Matrix

After completion of testing, various matrices are collected to prepare the test reports. This includes the number of the test cases executed, and passed and failed. Pass implies that the test cases were, run and no defects or deficiencies were observed. Fail implies that the test procedure includes a defect, and therefore, it does not meet the requirements.

CasesResult

Total number of test cases

118

Number of test cases executed

118

Number of test cases passed

118

Number of test cases failed

0

Number of test cases pending

0

Number of test cases in progress

0

Number of test cases blocked

0

Number of test cases rejected

0

Number of test cases deferred

0

Number of active defects

0

Defect Metrics

This can be used to find out the current status of the defects linked to the test cases. It includes the following:

  • Showstopper defect can be described as a bug which stops/restricts the testing to move ahead with that specific functionality or module.

  • Critical impact defect is a major disruption to the testing activity.

  • High impact defect test result shows impairments on critical business functionalities.

  • Medium impact defect test results show impairments on business functionalities.

  • Low impact defect is an aesthetic problem, with only cosmetic defects.

PriorityNumber of defects openedNumber of defects closedNumber of defects on holdNumber of defects rejectedDefects open at the end of the test phase

Showstopper

5

5

0

0

0

Critical

11

11

0

0

0

High

15

15

0

0

0

Medium

5

5

0

0

0

Low

45

0

0

0

0

Exit Criteria Status

This includes testing tasks to be completed before the current phase. The criteria includes completion of test cases execution, and capturing the actual results and logging defects. It specifies the conditions and requirements that are required to be achieved or fulfilled before the end of the software testing process.

Exit criteraCriteria met (Yes/No)If no, describe action plan

All test cases have been successfully executed.

Yes

All expected and actual results are captured and documented with the test cases.

Yes

All identified critical or high severity defects have been fixed and retested.

Yes

Any unresolved defects are documented and signed-off by the project manager.

Yes

All defects logged

Yes

Pass rate is over

Approvals

The test closure approval needs to be provided by the following:

Role

Name

Business owner

Tahera

Project manager

Riddhi

QA lead

Madan Kumar N C

Last updated

All content on this page by eGov Foundation is licensed under a Creative Commons Attribution 4.0 International License.