User Manual
Workbench Setup
Workbench Employee User Manual
Prerequisites
For the loading of data, the following will be required:
State-level user for workbench (to allow for loading of state data).
Urban local body (ULB)-level users for workbench (to allow for loading of ULB-specific data). One user for the workbench with access to all ULBs can also be created and the user can navigate across the ULB to upload data for each ULB
Checklist
Definitions
Login
ULB employees are provided with credentials to log in to the system. Role-based access for various steps in the workflow, that is, different individuals can be assigned to create an application, modify applications, or manage vendor, driver, and vehicle details.
User actions
On this page, the following actions can be performed:
Enter username and password.
Select a city for login.
Reset your password by clicking on the “Forgot Password” link.
On clicking continue, employees are redirected to the Workbench home page
Create Benchmark Rule
For the proper working of the platform, the following benchmark rules should be configured. If any other benchmark rules are configured, the system will not function:
Inbox
Click on “Add Master Data” to add a new benchmark rule
Create Quality Test Lab
Inbox
Click on “Add Master Data” to create new a Quality Test Lab
Create Material
Inbox
Click on “Add Master Data” to create new a material
Create Parameter
Inbox
Click on “Add Master Data” to create a new parameter
Create Plant Configuration
Inbox
Click on “Add Master Data” to create a plant configuration
Create Plant Type
Inbox
Click on “Add Master Date” to create a plant type
Create Process Type
Inbox
Click on “Add Master Data” to create a new process type
Create Unit
Inbox
Click on “Add Master Data” to create a new unit
Create Waste Type
Inbox
Click on “Add Master Data” to create new Waste Type
Create Source Type
Inbox
Click on “Add Master Data” to create a new source type
Create Stage
Inbox
Click on “Add Master Data” to add a new stage
Create Process
Inbox
Click on “Add Master Data” to create a new process
Create Plant
Once the plant is created, the plant user mapping has to be done through the backend. If there is already an FSM instance created and running, then the V1 of codes for plant and ULB has to be taken for V2 and the backend team will have to create the plants using the same codes.
Inbox
Click on “Add Master Data” to add a new plant
Create Quality Criteria
Inbox
Click on “Add Master Data” to add a new quality criteria
Create Test Standard
Inbox
Click on “Add Master Data” to add a new test standard
Last updated