Sanitation
PlatformDomainsAcademyDesign SystemFeedback
v1.4
v1.4
  • Introducing Water-Sanitation
  • Water-Sanitation
    • Solution Design
    • Approach
    • Release Notes
      • FSM 1.4 - Technical Release Summary
      • Service Build Update
        • Release Builds for Core
      • MDMS Changes
      • Configuration Updates
      • Test Cases
      • Localisation
      • Impel Release Notes
      • Gate 2 Checklist
      • Workflow Configuration Changes
      • Master Migration Document
      • Driver-Individual Migration Script
  • Water-Sanitation Product Suite
    • Waste Management System
      • Functional Specifications
        • TQM UI
          • How to Enable TQM UI
          • UI: Plant Operator
            • Landing and Home Page
            • Plant-User Mapping
            • Inbox/Update Tests
            • View Past Test Results/Test's Summary Screen
            • Help Section
          • UI: ULB Admin
            • ULB Admin Home Page
            • Inbox/Test Details Screen
            • View Past Test Results
            • Create Adhoc Test
        • TQM UI/UX Audit
      • Faecal Sludge Management (FSM)
        • Features
        • Sanitation Actors & Interactions
        • User Interface Design
        • FSM User Manual
          • FSM Citizen User Manual
          • Employee User Manual
          • Manage Vendor, Sanitation Worker and Vehicle Details
          • DSO User Manual
          • Septage Treatment Plant Operator User Manual
        • Test Cases
        • FSM Functional Specification
          • Sanitation Worker UI
            • FSM Registry
            • Create Sanitation Worker
            • Edit Sanitation Worker
            • Assign Sanitation Workers to FSM Applications
            • Sanitation Worker Details
          • FSM UI Docs
            • FSM Citizen UI
            • FSM Employee UI
            • FSM DSO UI
            • FSM FSTPO UI
          • FSM UI/UX Audit
        • FSM Technical Specification
          • Vehicle Technical Specification
          • Vendor Technical Specification
          • Calculator Technical Specification
        • FSM Release Notes
          • Known Issues List
        • Product Requirement Document
        • Training
        • Sanitation Worker Welfare
          • Vendor Registry
          • FSM Service
          • Sanitation Worker( FSM 1.4) UI/UX Audit
        • FSM-DSS Technical Documentation
        • Enablement toolkits(Assetization) for FSM
          • Getting started with DIGIT
          • Requirements to enable FSM Module in a new evironment
          • Dependency services of the FSM module
          • Data templates for data collection
          • Data loading steps
            • Loading Billing Slab Data
            • Loading Vendor,Vehicle and Driver Data
            • Loading Localisations
            • Plant Mapping of FSTP
            • Creating users for FSM
          • Preparation of MDMS Data for Data Loading
          • SMS Templates for FSM
        • URC Release Notes
          • Steps to Configure URC
        • Garima Release Notes
          • Steps to Configure Garima
        • User Personas
      • Treatment Quality Monitoring (TQM)
        • Features
        • User Stories
          • Treatment Quality Monitoring Dashboard KPIs
        • User Interface Design
        • User Manual
          • Employee User Manual
          • Treatment Plant Operator User Manual
        • TQM Setup
          • User Manual
        • Release Notes
          • Known Issue List
        • Product Requirement Document: Treatment Quality Monitoring (TQM)
        • PQM Technical Specification
        • TQM Impel Checklist & Roll-out Plan
    • Water & Sewerage Connections
    • NalJal
  • Technology
    • Architecture
      • PQM
        • Low Level Design
          • Services
            • PQM Service
            • PQM Anomaly Finder
            • PQM Scheduler
      • FSM
        • Low Level Design
          • Services
            • FSM Service
            • FSM Calculator
          • Registries
            • FSM Vendor Registry
            • FSM Vehicle Registry
    • Source Code
  • Reference Implementations
    • Odisha - SUJOG
      • Functional Customisation
        • Urban-Rural Convergence
        • Garima Implementation
          • User Interface Design
          • Product Requirement Document (PRD)
      • Technical Customisation
      • Technical Specification: Urban-Rural Convergence
      • Standard Operating Procedure (SOP)
      • Program Rollout Plan
      • Implementation Plan
      • Implementation Guide
      • Implementation Checklist
      • TQM Gate 2 Plans & Checklist
  • Setup
    • Setup
      • On AWS
    • Deployment Guide
      • Legacy/Re-Indexing the FSM Data
      • Legacy/Re-Indexing the PQM Data
      • FSM devops setups
      • FSM Calculator devops setup
      • Vendor registry devops setup
      • Vehicle registry devops setup
    • Development Guide
      • Backend Developer Guide
      • UI Developer Guide
    • Configuration
      • TQM
        • PQM Service
        • PQM Anomaly Finder
        • PQM Scheduler
      • FSM
        • FSM Service
        • Vendor Registry
        • Vehicle Registry
        • FSM Calculator
    • Operations Guide
  • COMMUNITY
    • Community Project: Vehicle Tracking
      • Release Notes
        • Service Build Update
          • Release Builds for Core
        • Test Cases
      • Architecture
        • Vehicle Tracking
          • High Level Design
          • Low Level Design
      • User Manuals
        • Employee User Manual
        • Driver User Manual
      • Demo
      • Product Requirement Document (PRD)
      • Deployment Guide
      • Setup
      • Source Code
    • Contribute
    • Issues
Powered by GitBook

All content on this page by eGov Foundation is licensed under a Creative Commons Attribution 4.0 International License.

On this page

Was this helpful?

Export as PDF
  1. Water-Sanitation Product Suite
  2. Waste Management System
  3. Treatment Quality Monitoring (TQM)

Features

The following features/components will be available in the TQM module:

Features/Components

Description

Functionality

Schedule of Tests

This component will be used by treatment plant operators and urban local body (ULB) employees to see the schedule of tests.

View the schedule of lab tests and track the compliance. Track the compliance of IoT test results and cases of failures.

Recording Test Results

This component will be used by treatment plant operators and ULB employees to upload results manually and track IoT readings.

Create digital records of quality test results alerts in the following cases:

  1. IoT device not working.

  2. Lab results do not match IoT results.

Anomaly Detection

This component will be used by treatment plant operators and ULB employees to interpret test results.

Identify in real-time/near real-time when the results of a particular test are not as per the benchmarks.

Alerts in the following case:

  1. Results not upto the benchmark.

Dashboards

This module will give stakeholders insights and information regarding the operations of the treatment plant. Users can use this to drill down and identify plants and processes where compliance to testing and/or test results are not upto benchmarks.

Dashboards will also help users see trends over time to see patterns and identify long-term problem areas.

Dashboard to analyse trends in the treatment quality and compliance with the treatment schedule. Drill down will be made available from state to the ULB and at a plant level.

Dashboard to analyse patterns in issues. A drill down will be made available from state to ULB and at a plant level.

Objective

The aim is to provide the users of the system information and control at each level - from defining how operations will be run, to updating status against pending operational tasks, and viewing operational data to draw insights to refine operations.

Was this helpful?