Sanitation
PlatformDomainsAcademyDesign SystemFeedback
v1.4
v1.4
  • Introducing Water-Sanitation
  • Water-Sanitation
    • Solution Design
    • Approach
    • Release Notes
      • FSM 1.4 - Technical Release Summary
      • Service Build Update
        • Release Builds for Core
      • MDMS Changes
      • Configuration Updates
      • Test Cases
      • Localisation
      • Impel Release Notes
      • Gate 2 Checklist
      • Workflow Configuration Changes
      • Master Migration Document
      • Driver-Individual Migration Script
  • Water-Sanitation Product Suite
    • Waste Management System
      • Functional Specifications
        • TQM UI
          • How to Enable TQM UI
          • UI: Plant Operator
            • Landing and Home Page
            • Plant-User Mapping
            • Inbox/Update Tests
            • View Past Test Results/Test's Summary Screen
            • Help Section
          • UI: ULB Admin
            • ULB Admin Home Page
            • Inbox/Test Details Screen
            • View Past Test Results
            • Create Adhoc Test
        • TQM UI/UX Audit
      • Faecal Sludge Management (FSM)
        • Features
        • Sanitation Actors & Interactions
        • User Interface Design
        • FSM User Manual
          • FSM Citizen User Manual
          • Employee User Manual
          • Manage Vendor, Sanitation Worker and Vehicle Details
          • DSO User Manual
          • Septage Treatment Plant Operator User Manual
        • Test Cases
        • FSM Functional Specification
          • Sanitation Worker UI
            • FSM Registry
            • Create Sanitation Worker
            • Edit Sanitation Worker
            • Assign Sanitation Workers to FSM Applications
            • Sanitation Worker Details
          • FSM UI Docs
            • FSM Citizen UI
            • FSM Employee UI
            • FSM DSO UI
            • FSM FSTPO UI
          • FSM UI/UX Audit
        • FSM Technical Specification
          • Vehicle Technical Specification
          • Vendor Technical Specification
          • Calculator Technical Specification
        • FSM Release Notes
          • Known Issues List
        • Product Requirement Document
        • Training
        • Sanitation Worker Welfare
          • Vendor Registry
          • FSM Service
          • Sanitation Worker( FSM 1.4) UI/UX Audit
        • FSM-DSS Technical Documentation
        • Enablement toolkits(Assetization) for FSM
          • Getting started with DIGIT
          • Requirements to enable FSM Module in a new evironment
          • Dependency services of the FSM module
          • Data templates for data collection
          • Data loading steps
            • Loading Billing Slab Data
            • Loading Vendor,Vehicle and Driver Data
            • Loading Localisations
            • Plant Mapping of FSTP
            • Creating users for FSM
          • Preparation of MDMS Data for Data Loading
          • SMS Templates for FSM
        • URC Release Notes
          • Steps to Configure URC
        • Garima Release Notes
          • Steps to Configure Garima
        • User Personas
      • Treatment Quality Monitoring (TQM)
        • Features
        • User Stories
          • Treatment Quality Monitoring Dashboard KPIs
        • User Interface Design
        • User Manual
          • Employee User Manual
          • Treatment Plant Operator User Manual
        • TQM Setup
          • User Manual
        • Release Notes
          • Known Issue List
        • Product Requirement Document: Treatment Quality Monitoring (TQM)
        • PQM Technical Specification
        • TQM Impel Checklist & Roll-out Plan
    • Water & Sewerage Connections
    • NalJal
  • Technology
    • Architecture
      • PQM
        • Low Level Design
          • Services
            • PQM Service
            • PQM Anomaly Finder
            • PQM Scheduler
      • FSM
        • Low Level Design
          • Services
            • FSM Service
            • FSM Calculator
          • Registries
            • FSM Vendor Registry
            • FSM Vehicle Registry
    • Source Code
  • Reference Implementations
    • Odisha - SUJOG
      • Functional Customisation
        • Urban-Rural Convergence
        • Garima Implementation
          • User Interface Design
          • Product Requirement Document (PRD)
      • Technical Customisation
      • Technical Specification: Urban-Rural Convergence
      • Standard Operating Procedure (SOP)
      • Program Rollout Plan
      • Implementation Plan
      • Implementation Guide
      • Implementation Checklist
      • TQM Gate 2 Plans & Checklist
  • Setup
    • Setup
      • On AWS
    • Deployment Guide
      • Legacy/Re-Indexing the FSM Data
      • Legacy/Re-Indexing the PQM Data
      • FSM devops setups
      • FSM Calculator devops setup
      • Vendor registry devops setup
      • Vehicle registry devops setup
    • Development Guide
      • Backend Developer Guide
      • UI Developer Guide
    • Configuration
      • TQM
        • PQM Service
        • PQM Anomaly Finder
        • PQM Scheduler
      • FSM
        • FSM Service
        • Vendor Registry
        • Vehicle Registry
        • FSM Calculator
    • Operations Guide
  • COMMUNITY
    • Community Project: Vehicle Tracking
      • Release Notes
        • Service Build Update
          • Release Builds for Core
        • Test Cases
      • Architecture
        • Vehicle Tracking
          • High Level Design
          • Low Level Design
      • User Manuals
        • Employee User Manual
        • Driver User Manual
      • Demo
      • Product Requirement Document (PRD)
      • Deployment Guide
      • Setup
      • Source Code
    • Contribute
    • Issues
Powered by GitBook

All content on this page by eGov Foundation is licensed under a Creative Commons Attribution 4.0 International License.

On this page
  • Release Summary
  • New Module
  • New Feature Additions
  • Document Resources & Links
  • Success Criteria
  • Product Roadmap

Was this helpful?

Export as PDF
  1. Water-Sanitation Product Suite
  2. Waste Management System
  3. Treatment Quality Monitoring (TQM)

Release Notes

Was this helpful?

Release Summary

DIGIT Sanitation is enhanced with a new Product -Treatment Quality Monitoring(TQM). The Treatment Quality Monitoring aims to improve the Treatment Quality of plants by ensuring that timely tests are conducted and any deviations are addressed quickly. To know more about Treatment Quality Monitoring(TQM) , please follow the

New Module

  • Treatment Quality Monitoring(TQM)

New Feature Additions

Feature

Description

  1. Schedule of Tests

  • This component will be used by treatment plant operators and urban local body (ULB) employees to see the schedule of tests.

  1. Digital Record of Test Results

  • This component will be used by treatment plant operators and ULB employees to upload results manually and track IoT readings.

  1. Anomaly Detection

  • This component will be used by treatment plant operators and ULB employees to interpret test results.

4. Dashboards

  • This module will give stakeholders insights and information regarding the operations of the treatment plant. Users can use this to drill down and identify plants and processes where compliance to testing and/or test results are not upto benchmarks.

  • Dashboards will also help users see trends over time to see patterns and identify long-term problem areas

Document Resources & Links

  • Click for Known Issue List.

Success Criteria

Goal

Category

Objective

How will it be measured via the product

How will we know TQM is successful

Zero deaths, diseases, and environmental contamination resulting from poor sanitation

Primary

To ensure treated waste is as per the quality standards

The percentage of treatment quality tests passed for a specific period

Increase in the percentage of treatment quality tests passed for a specific period

Zero deaths, diseases, and environmental contamination resulting from poor sanitation

Secondary

To ensure treated waste is tested regularly for quick identification of issues

The percentage compliance against testing schedule for a specific period

Increase in the percentage compliance against testing schedule over time

Product Roadmap

GitBook Link.
here